Skifield Prepares for Snow-Making – May 2014
Our BWC digger was employed to dig out the 900m long by 1.5m deep ditch for the Ohau Snow Field’s snow-making system reticulation, water and air pipes, high and low voltage cables, and communications cable: Article in the Otago Daily Times, May 2014.
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed